Work Breakdown Structure of the TG-CONS Project

Official WBS document

The official Technical Galleries Consolidation project Work Breakdown Structure is available in the TG-CONS EDMS structure.

Groups Involved

SCE-SAM

CIVIL ENGINEERING: Galleries structure, asbestos removal, doors, metal frames, roofs, ladders, false floors, heating network, cables & lighting, ventilation systems, drain

EN-PAS

MANAGEMENT: Planning, quality, general technical coordination

EN-ACE

CP2-ENGINEERING: Future configuration, integration 3D, best practices & optimization, future prospects

EN-EL

ELECTRICAL SYSTEMS: Power distribution, DC cabling, optical fibre

EN-AA

ALARMS: Fire detection, ODH

EN-CV

COOLING AND VENTILATION: Drinking & fire water network, sumps, compressed air, heating pipework, cooling circuits, supply demin water

TE-CRG

CRYOGENICS: Cryogenic pipelines

SY-EPC

POWER CONVERTERS: DC Cables

SY-ABT

BEAM TRANSFER: Cables

EP-SME

EXPERIMENT EQUIPMENT: Meyrin site experiments, NA Experiments

IT-CF

INFORMATION TECHNOLOGY: IT cables

BE-CEM

CONTROLS ELECTRONICS: Controls infrastructure

HSE-OHS

PROJECT SAFETY: Safety coordination, HSE & CSAP link

BE-EA

EXPERIMENTAL AREAS: Gas pipework

HSE-RP

RP4-INTEGRATED SAFETY: RP classification, lock-out procedure

EP-ADO, EP-AIO, EP-CMS, EP-LBO

EXPERIMENTS EQUIPMENT: ATLAS, ALICE, CMS, LHCb