Official WBS document
The official Technical Galleries Consolidation project Work Breakdown Structure is available in the TG-CONS EDMS structure.
Groups Involved
CIVIL ENGINEERING: Galleries structure, asbestos removal, doors, metal frames, roofs, ladders, false floors, heating network, cables & lighting, ventilation systems, drain
CP2-ENGINEERING: Future configuration, integration 3D, best practices & optimization, future prospects
COOLING AND VENTILATION: Drinking & fire water network, sumps, compressed air, heating pipework, cooling circuits, supply demin water